DISTRICT: YENDI MUNICIPAL ASSEMBLY
CONTITUENCY: YENDI CONTITUENCY
LAND SIZE: 1,446.3 SQ KM
POPULATION (PROJECTED): 154,283
RELIGIOUS STATISTICS: = CHRISTIANITY – 17.4%
ISLAM- 67.2%
TRADITIONAL – 13.2%
MAIN OCCUPATION: = AGRICULTURE 80%,
WEAVING 7%
SHEA BUTTER EXTRACTION
5%
DATE CREATED: = 1988 BY PNDC LAW 207, ACT
462, (LI 1443)
(2007 BY L. I 2070 AS A
MUNICIPAL)
TABLE 1: YENDI MUNICIPAL COVID – 19 STATISTICS AS AT 17/08/2020
S/N | Indicator | Number |
Total Samples collected | 236 | |
Total Positives | 13 | |
Total Negatives | 99 | |
Results Pending (contacts and suspects) | 124 | |
Number of positive cases on treatment | 0 | |
Number of patients recovered | 12 | |
Number of patients critically ill | 0 | |
Number of Deaths | 1 | |
Active Cases | 0 |
MEASURES TAKEN TO DEAL WITH MARKET DISINFECTION AND SOCIAL DISTANCING.
- The Assembly have arranged with the Municipal Environmental Health Unit and the Zoomlion to carry out half yearly disinfection of the various markets and other open places throughout the Municipality
- In this regard, a Municipal-wide disinfection of markets and other public places half yearly have been duely planned and budgeted for in the 2021 Composite plan and budget
- Management have equally decongested some of the traders to the new market for proper adherence to the social distancing protocol
- The NCCE, Ghana Health Service and the Environmental Health Unit have continued with their sensitization of citizens on the need to wear face masks and social distancing throughout the Municipality
- EDUCATION:
- COMPLETED/ ONGOING PROJECTS AND SUPPORT:
- Constructed 8 No. 3 Unit classroom blocks with Ancillary Facilities at Yendi Jubilee K.G, Nakpachei Primary School, Faisaliyah JHS-Yendi, T.I Ahamadiyyah Primary School-Yendi, Kamshegu Primary School, Kpanjihi Primary School, RC Block C Primary-Yendi and Sualihiya Primary-Yendi. (completed – 100%)
- Constructed1No. 3-Bedroom Teacher’s Quarters at Sunsong (completed – 100%)
- Supplied 132 Metal Dual Desks to Kpanjihi and R/C Primary Schools (completed – 100%)
- Supply of 681 No. Dual Desks to Selected Schools in Yendi Municipality. MP Funded (completed – 100%)
- Constructed 1No. 6-Unit Classroom Block at Yendi SHS- GNPC Funded (completed – 100%)
- 1No. 8 Unit Dormitory Block at Yendi SHS – GETFUND (completed – 100%)
- Construction Of 1No. 2 Storey 12 Unit Classroom Block at Yendi SHS – GETFUND (ongoing)
- Construction Of 1No. 2 Storey 12 Unit Classroom Block at Dagbon State SHTS – GETFUND (ongoing)
- Construction of 3 NO. 3 Unit Classroom block ,4-Seater KVIP and Urinal at Kulpkanga, Gundogu and Gnani (NDA/IPEP support- Ongoing)
- Construction of 3 Unit Classroom Block with Furniture at Zakoli (NDA/IPEP support- Ongoing)
- Construction of 1No. 3Unit Classroom Block with Furniture at Bunbong JHS-Ongoing
- Supply of 300 Pieces Of Dual Furniture For Newly Built Schools – Gnani Gondogu & Kulkpanga Primary Schools (NDA/IPEP support)-Ongoing
- PROPOSED / UPCOMING PROJECTS AND SUPPORT:
- Construction GES Office Complex (One Constituency One Million Dollar Programme)
- CHALLENGES:
Inadequate Office Accommodation for Municipal Directorate of Education
- HEALTH:
- COMPLETED/ ONGOING PROJECTS AND SUPPORT:
- Construction and Furnishing of CHPS Compound at Kpanjamba (completed – 100%)
- Construction and Furnishing of CHPS Compound at Kulkpanga (completed – 100%)
- CHPS Compound and Nurses Quarters at Gbungbalga (completed – 100%)
- Furnished CHPS Compound at Yimahigu and Kamshegu (completed – 100%)
- Furnished of CHPS Compound at Kpanjamba (completed – 100%)
- Constructed 1 NO. Semi-Detached Bungalow for The Municipal Health Directorate at Yendi – MP Funded (completed – 100%)
- Construction of CHPS Compound at Waliyapala (ongoing)
PROPOSED / UPCOMING PROJECTS AND SUPPORT:
- Construction of Gnani Polyclinic (One Constituency One Million Dollar Programme)
- Upgrade of Yendi Government Hospital (One Constituency One Million Dollar Programme)
CHALLENGES OF THE HEALTH SECTOR IN YENDI
- Inadequate critical health professionals (Medical Officers, Midwives, Staff Nurses, Physician Assistants)
- Inadequate CHPS compounds 12/31
- Inadequate and weak motorbikes for service delivery
- Deplorable state of some health facilities especially Oseido CHPS compound
- Inadequate medical equipment for service delivery (Weighing Scales, Delivery Sets, BP Apparatus Etc.)
- Acute water shortage in health facilities especially during the dry season
- Inadequate residential accommodation for health staff
- Inaccessible roads to some communities during the rainy season
- ENERGY:
- COMPLETED/ ONGOING PROJECTS AND SUPPORT:
- Extension of electricity to Five (5) communities namely Takoroyili, Yashegu, Borido, Sukani and Kpaachiyili (completed – 100%)
- Provision of Street Lights in Yendi Township and Gbewaa Palace (completed – 100%)
- CHALLENGES:
- Low electricity coverage for Local Economic Activities that require electric power
- SECURITY:
- COMPLETED/ ONGOING PROJECTS AND SUPPORT:
- Rehabilitated 1No. Police Quarters at Yendi (completed – 100%)
- Rehabilitated and Modernized the Yendi Circuit Court (completed – 100%)
- Rehabilitation of Acheampong House (Military Detachment) -(Completed- 100%)
- PROPOSED / UPCOMING PROJECTS AND SUPPORT:
Rehabilitate the defunct Aerodrome at Yendi
- WATER AND SANITATION:
- COMPLETED/ ONGOING PROJECTS AND SUPPORT:
- Drilled 2 No. Boreholes at new lorry Park (completed – 100%)
- Drilled and Installed 11 No. Mechanized Boreholes at GWCL 1&2, Kalibila, Saasigli, Acheampong House, Wariyapala, kunkong,Zugu,Tibibaya,Malzeri and Nayilifong (completed – 100%)- Funding from Assembly
- Drilled and Installed 15 No. Hand Pump Boreholes at Kpatuya, meindougu, Guntingli, sakuni, Linguli, Kpalisanado, Napirdo, Marbedo, Kpanjamba, Nakmoni, Baaduli, Barli, Gundu Wagri, Nasah and Yaarini. (completed – 100%)-Funding from Assembly
- Constructed a Mechanized borehole for domestic and irrigation purposes at Zakoli. CCFC support (Completed – 100%)
- Drilling of 2No.Mechanized Boreholes at Gnani and Malzeri(Ongoing)-Funding from GNPC
- Drilling of 5No. Handpump Boreholes at Oseido,Gundogu,Nashegu,Yimahigu and Jigim-Ongoing(Funding from Ministry of Sanitation and Water Resources)
- Rehabilitated 4 No. Boreholes and 1 No. installation namely; Nagani, Tusani, Sakpegu and Nalogu (Completed – 100%)
- Constructed 4 No. Mechanized Boreholes powered by solar at Adibo, Chepondo, Kulikpeniduli and Nabugu MSDI Support (Completed – 100%)
- Constructed 2 No. Mechanized Boreholes at Nakpachei and Naglogu – Ghana’s Consulate in Dubai (Completed – 100%).
- Constructed 4 No. 4-Seater KVIP Toilet at Gnani Health Centre, Yemahagu CHPS, Yendi Health Centre and Sunson CHPS (Completed – 100%) – Funding from UNICEF
- Construction of 4 No. 10-seater Water closet toilets with mechanized boreholes and Solar panels in Sunson, Yendi Senior High School, Dagbon State Senior High Technical School and Yendi Hospital MSDI Support (ongoing)
- PROPOSED / UPCOMING PROJECTS AND SUPPORT:
- To train Municipal Water and Sanitation Team (MWST) members on water quality test and sitting of a borehole (GoG, IGF)
- Reactivating and training water and sanitation (WATSAN) committee in beneficiary communities (GoG, IGF)
- Strengthen of MWST on ICT (GoG, IGF)
- To collect Data on functionable and non-functionable Boreholes in the Municipality (GoG, IGF)
- Upgrade of Yendi Water System (GoG)
- CHALLENGES:
- Inadequate funding to execute prosed activities
ROADS:
- COMPLETED/ ONGOING PROJECTS AND SUPPORT:
- Opened and reshaped 3.8km road from Galbang to Sakuni (completed – 100%)
- Opened and reshaped 7.4km road from Kpalgigbini to Bogni (completed – 100%)
- Opened and reshaped 3.8km road from Zugu to Banchiya (completed – 100%)
- Opened and reshaped 2.5km road from Kuga to Zang (completed – 100%)
- Opened and reshaped 8.5km road from Worikpomo to Banchiya (completed – 100%)
- Reshaped and Gravel 10.4km Feeder Roads from Zagbang to Kpasani (completed – 100%)
- Reshaped and Spot Improvement of 2.7 km Road form Nakpachei to Kpagbilogni (completed – 100%)
- Reshaped and Gravel 6.5 Km Feeder Roads from Yendi to Kushegu to Gbambaya and Bini (completed – 100%).
- Reshaped and Spot Improvement of 9.7 Km Feeder Road – Kpasanado to Jagando and Nkuuyili (completed – 100%).
- Reshaped 6.2km Feeder Road from Gbungbalga to Kpalsongni (completed – 100%)
- Surfacing of 10.5 Km Feeder Road from Yendi- Gukpegu and Gbungbaliga (Ongoing)
- Surfacing Of 10 Km Feeder Road –from Yendi- Gundogu and Kulkpanga(Ongoing)
- Reshaped and Spot Improvement Of 5.5 Km Road from Ngani to Kpanjamba and Demong (completed – 100%)
- Opened and Reshaped 3.8 Km Feeder Road from Gbungbaliga to Gambugni No. 1 and 2 (completed – 100%)
- Reshaped and Gravel 3.6 Km Road from Zugu to Neibong (completed – 100%)
- Reshaped and Gravel of 2.6 Km Feeder Road – Eastern Corridor Camp to Gundogu (completed – 100%)
- Opened and Reshaped 2.2 Km Feeder Road from New Lorry Park to Kushegu (completed – 100%)
- Reshaping and Gravelling of1.2 Km Road – Yendi Administration Block to Electoral Commission Office (completed – 100%)
- Constructed 1 No. Footbridge (25m X 25m) at Gamanzi (completed – 100%)
- Constructed 1 No. (2m X 2m) Box Culvert Bridge Linking Gagbeni to Gamanzi and Panduli (NDA/IPEP support completed – 100%)
- Constructed 1 No. (2m X 2m) Box Culvert at Kpasanado to Jagando Road (NDA/IPEP support completed – 100%)
- Constructed 1 No. (2m X 2m) Double Culvert at Waliyapala/Worikpomo (NDA/IPEP support completed – 100%)
- Constructed Steel Bridge at Kuni (completed – 100%)
- Routine Road Maintenance works (completed – 100%)
- Rehabilitation of Selected Roads in Yendi Municipality (6.8Km) (completed – 100%)
- Rehabilitation of Link road at Sikafuo MP link (NDA/IPEP support – Ongoing)
- Pothole Patching/grading of Arterial Roads in Yendi (ongoing)
- Pothole Patching/grading of Local Roads in Yendi (ongoing)
- PROPOSED / UPCOMING PROJECTS AND SUPPORT:
- Routine Road Maintenance works (Ghana Road Fund, Municipal Assembly)
- Maintenance of Selected Trunk and Feeder Roads (Tamale – Yendi – Tatale Road) Under the Transport Sector Improvement Project (TSIP: P151026) Project
- CHALLENGES:
- Network Challenges: upgrading works on local roads
- Staffing Challenge: need for support staff, at least two (2) technical Staff
AGRICULTURE:
- COMPLETED/ ONGOING PROJECTS AND SUPPORT
1V1D
- Construction of 10No.Dams under 1V1D Flagship Program at Nakpachei, Adibo, Gbungbaliga, Zang, Kpaligigbini, Kanarido, Kushegu, Bunbong, Nagani and Wanbung.-Ongoing
TABLE 2: PLANTING FOR FOOD AND JOBS & PERD 2017 TO 2020
2017 | |||||
Fertilizer or seed type | Quantity Received (50kg) | Quantity sold (50kg) | Beneficiary farmers | ||
Males / Females | |||||
NPK | 6,359 | 6,359 | 746 | ||
UREA | 3,380 | 3,380 | |||
YARA LEGUME | 462 | 462 | |||
SEED | Quantity received | Quantity sold | |||
MAIZE | 350 (45kg) | 350 (45kg) | 506 | ||
RICE | 200 (40kg) | 200 (40kg) | 101 | ||
SOYA | 55.8 (45kg) | 55.8 (45kg) | 38 | ||
Totals | 1,391 | ||||
TABLE 3: 2018 PLANTING SEASON | |||||
Beneficiary farmers | Beneficiary farmers | Beneficiary farmers | Beneficiary farmers | ||
Maize | 700 (45 kg bags) | 108 | |||
Rice | 1,847 (40 kg bags) | 117 | |||
Soya | 654 (45 kg bags) | 154 | |||
NPK | 28,000 (50 kg bag) | 5,299 | |||
UREA | 8,000 (50 kg bag) | 2115 | |||
Totals | 7,793 | ||||
PFJ 2019 | |||||
Fertilizer or seed type | Quantity received by dealers (25kg) | Quantity sold by dealers (25kg) | Beneficiary farmers male female | ||
NPK | 38,849 | 38,849 | 4,974 | 315 | |
UREA | 4,440 | 4440 | |||
ORGANIC | 300 | 300 | |||
MAIZE | 971 | 971 | 800 | 38 | |
RICE | 1,540 | 1,540 | 896 | 35 | |
SOYBEAN | 245 | 245 | 474 | 4 | |
TOTALS | 7,144 | 392 | |||
TABLE 4 | |||||
PFJ 2020 | |||||
Fertilizer or seed type | Quantity received by dealers (kg) | Quantity sold by dealers (kg) | Balance | Beneficiaries | |
Maize | OPV | 82,305kg | 45,045kg | 37,260 | 978 |
Hybrid | 5650kg | 5,000 | 650 | 89 | |
Rice | 70,000kg | 30,000 | 40,000 | 275 | |
Soya | 45,000 | 31500 | 13,500 | 316 | |
NPK | 19860 (25kg bags) | 5958 | 13,902 | 993 | |
TOTALS | 1,658 |
TABLE 5: PERD DATA (CASHEW) 2019
NAME OF DISTRICT | NO. OF CUMMUNITIES | NO. OF FARMERS | NO OF SEEDS RECEIVED | NO OF SEEDLINGS PRODUCED | NO. OF SEEDLINGS DISTRIBUTED | F | M | Total |
YENDI | 24 | 225 | 60,000 | 50,000 | 45,000 | 9 | 216 | 225 |
PERD 2020
- 2,800 cashew seedlings raised and distributed to farmers.
- The Ghana Agricultural Sector Investment Program (GASIP) have drilled three boreholes and mechanization of the three boreholes for irrigation purposes, in three communities thus Kpatia, Kushegu and Kpalgigbini is on-going.
GENERAL INFRASTRUCTURE:
- COMPLETED/ ONGOING PROJECTS AND SUPPORT:
- Donated 1 No. Pick Up to the Municipal Education Office (Completed – 100%)
- Procured 2 No. Motor King for the Yendi Abattoir(Completed – 100%)
- Repair of Broken-Down Heavy-Duty Trucks(Completed – 100%)
- Rehabilitated Presidential Lodge (Completed – 100%)
- Rehabilitation of the Administration Block Phase I (completed – 100%)
- Rehabilitation of the Administration Block Phase II (completed – 100%)
- Constructed Business Resource Centre (MOTI Support completed – 100%).
- Rehabilitated 1storey Market Stores at Yendi Phase II (completed – 100%)
- Constructed 1 No. 10-Unit Lockable Stores at Adibo (completed – 100%)
- Constructed 1 NO. 3M X 3M Double Culvert at Sankuni (NDA/IPEP support completed – 100%)
- Constructed 1 NO. 2M X 2M Double Culvert at Pansiya (NDA/IPEP support completed – 100%)
- Rehabilitation of Link Road at Nabogu (NDA/IPEP support Ongoing)
- Construction of Youth Resource Centre at Zang (ongoing)
- Construction of Astro Turf at The Jubilee Park in Yendi(ongoing)
- PROPOSED / UPCOMING PROJECTS AND SUPPORT:
- Establishment of a Soya Bean factory under 1D1F (MOTI)
MID-YEAR FISCAL POLICY REVIEW
- As at July, 2020 total revenue generated by the Assembly was GH¢4,684,097.70 as against the budgeted figure of GH¢10,423,268.19
- In percentage terms was 4,684,097.70/10,423,268.19X100
→ = 44.93%
- With the IGF performance in the Municipality as at July, 2020 was 322,119.50/851,000X100
→ = 37.85%
- IGF as a proportion to total revenue as at July, 2020 was
322,119.50/4,684,097.70X100
→ = 6.88%
The details are shown in table 8 and 9.
- The Covid-19 pandemic have actually affected the financial position of the Assembly as our IGF generation has being low as compared with the previous years.
TABLE 6: UPDATE ON REVENUE SOURCES
REVENUE | BUDGETED | ACTUAL RECEIPTS AS AT JULY, 2020 |
IGF | 851,000.00 | 322,119.50 |
GoG Salaries | 2,680,427.69 | 1,924,619.20 |
Common Fund | 3,473,782.50 | 592,495.96 |
MPs Common Fund | 300,000.00 | 254,092.00 |
PWD | 200,000.00 | 318,178.25 |
M-SHAP | 17,300.00 | 5,688.25 |
DPAT Capacity | 34,615.00 | – |
DPAT – Responsive Factor Grant | 1,040,360.00 | 898,609.91 |
Agric – GoG | 47,790.00 | – |
Feeder Roads – GoG | 17,166.00 | – |
Urban Roads – GoG | 38,120.00 | – |
Physical Planning – GoG | 32,674.00 | – |
Community Dev’t. & Social Welfare | 14,092.00 | – |
CIDA – Agric – MAG | 215,941.00 | 368,294.63 |
UNICEF | 400,000.00 | – |
USAID | 1,000,000.00 | – |
MPS SIP | 60,000.00 | – |
TOTAL | 10,423,268.19 | 4,684,097.70 |
TABLE 7: EXPENDITURE ITEMS
REVENUE | BUDGETED | ACTUAL RECEIPTS AS AT JULY, 2020 |
IGF | 851,000.00 | 412,458.99 |
GoG Salaries | 2,680,427.69 | 1,924,619.20 |
Common Fund | 3,473,782.50 | 757,078.56 |
MPs Common Fund | 300,000.00 | 185,666.50 |
PWD | 200,000.00 | 149,496.70 |
M-SHAP | 17,300.00 | 4,750.00 |
DPAT Capacity | 34,615.00 | – |
DPAT – Responsive Factor Grant | 1,040,360.00 | 418,155.25 |
Agric – GoG | 47,790.00 | – |
Feeder Roads – GoG | 17,166.00 | – |
Urban Roads – GoG | 38,120.00 | – |
Physical Planning – GoG | 32,674.00 | – |
Community Development & Social Welfare | 14,092.00 | – |
CIDA – Agric – MAG | 215,941.00 | 111,405.00 |
UNICEF | 400,000.00 | – |
USAID | 1,000,000.00 | – |
MPS SIP | 60,000.00 | – |
TOTAL | 10,423,268.19 | 3,963,630.20 |